Frameless Marble Arch London
Woodward & Co were appointed to undertake the design and build fit out of this new Immersive Gallery experience located in over 30,000 sq/ft of basement levels. This project is the first of its kind within London and the client set their stall out for this to be within the top 10 tourist attractions in London. 5 large gallery spaces coupled with café, gift shop & offices. The site posed real challenges from a services perspective with no external plant space and a very complex smoke extract system
Services included:
- Primary Fresh Air Heat Recovery Supply & Extract
- Installation of large Air Handling Units
- 4 pipe fan coil units and DX Air conditioning Units
- Chilled water & LTHW installation
- Smoke extract system c/w 58 dampers, 20 zones and 8 different fan speeds
- Hot & Cold Water Services
- Above Ground Drainage installations
- BMS Controls Installations