Waitrose VMUs x 5 sites

Woodward & Co secured the  Stage 1 tender for the design and installation of  Emergency Methane gas detection extract systems to a number of their Vehicle Maintenance Units across 5 separate sites. We were appointed Principle contractor and were responsible for all aspects of the installations including mechanical and electrical works, structural, builderswork, fire alarm modifications together with formalising the cause and effect strategies. All works were undertaken within live buildings and busy VMU’s in a phased manor

Services included:

  • ATAX explosion proof extract fans
  • Motorised dampers and ductwork
  • Electrical wiring and modifications to incoming electrical boards
  • L/L & H/L Methane gas detection system and Vesda detection
  • Structural builderswork
  • BMS controls modifications